久久精品二区亚洲w码_懂色av字幕在线_欧美一区三区在线观看_97久久国产亚洲精品超碰热_国产精品54页_久久久久成亚洲国产av综合精品

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:2002

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
主站蜘蛛池模板: 邯郸市| 中宁县| 江北区| 北票市| 福海县| 吴旗县| 郎溪县| 随州市| 临汾市| 南昌市| 双城市| 天峻县| 龙岩市| 长白| 班戈县| 清流县| 山阳县| 绍兴县| 龙门县| 托里县| 莫力| 信宜市| 融水| 昭平县| 黔东| 梅河口市| 丽水市| 来安县| 喜德县| 罗田县| 三门县| 墨脱县| 嫩江县| 资中县| 黎城县| 河北省| 沧州市| 永登县| 辽宁省| 任丘市| 海南省|